GB/T 17643-2025 Polyethylene Geomembrane: Procurement and Incoming-Inspection Guide

The new version has been implemented in November 2025, and procurement documents should be updated for standard years and verified for classification, raw materials, testing and identification.

Standard specifications

Project judgments and procurement conclusions

GB/T 17643-2025 has replaced GB/T 17643-2011. New inquiries, tenders and inspection mandates should not continue to be uniformly written in brackets by country, but should specify standard numbers with year, product type, common thickness, surface shape, additional requirements for use and sampling rules. Old projects such as contracts still refer to the 2011 version, and should be confirmed in writing by the contractors whether the changes have been made, and suppliers cannot replace the version themselves.

Standard specifications

Key parameters and quick judgement tables

Purchasing documentsContent should be writtenAcceptance of evidence
Implementing standardsGB/T 17643-2025 or contract specified versionContract consistent with report
Product identificationThe material, the surface, the thickness, the widthPackaging and packaging
Key performanceStretching, tearing, piercing, long-term projectsBatch reports
DeliveryThe following is a list of the most common types of food in the world:Photos and records of arrival

Standard specifications

Acceptance points and common risks

  • New and old versions mixedThe test project and the calibre may not be consistent, and the data cannot be directly compared.
  • Just look at the qualifying section.The report must be verified in relation to the sample, specification, date and volume number.
  • Copy the full text of the standardThe website is only for engineering interpretation and is formally determined to use legal standard text.

Standard specifications

Steps to landing

  • Updated tender form

    Remove expiration years and vague country of origin reference lists.

  • Create a matrix of parameters

    Write down each test item, method and acceptance value in a table.

  • Locking samples

    Clear batch definition, sampling location and third party testimony.

  • The reviewed rolls

    The standard, model, volume number and report must be consistent.

Technical basis

Standards and references

Need a Geomembrane Quotation?

Prepare the thickness, quantity, application and destination port for an accurate quotation.