Geosynthetics Export Documentation: Customs, Inspection and Project Records

To manage trade certificates, product batch documents and project technical documents, reduce clearance and on-site acceptance of defects.

Foreign trade issues

Steps to landing

  • The following matrix

    Each item is written in a form, issuer, language and deadline.

  • Unified product name code

    The contract, invoice, box order and label are consistent.

  • Pre-examination before shipment

    The scanning is confirmed by the buyer and the agent.

  • Creating version archives

    The final stamps are kept together with the corresponding batches.

Foreign trade issues

Key parameters and quick judgement tables

The group of documentsCommon documentsResponsibility
Commercial transportContracts, invoices, containers, ticketsBuy and sell and exchange
Raw materials and raw materialsThe first is the proof of origin, declaration elements, certification.Buyers are clearing agents
Quality documentsCOA, batch reports, third party testingFactory/Lab
Delivery of projectsThe list of volumes, cabinet photos, installation informationFactory and project aspects

Foreign trade issues

Acceptance points and common risks

  • The customer's requirements are regulatedThe two should be verified separately, avoiding unnecessary certification costs.
  • The third party inspection is required after the cabinet is installed.The closing of the cabinet may not be possible after the requested sampling.
  • Missing the bookCOA cannot match the material to the goods.

Foreign trade issues

Project judgments and procurement conclusions

Export documents are managed in at least three groups: commercial and transportation documents, origin and destination country compliance documents, product quality and project acceptance documents. The requirements for different destination countries and trade terms vary greatly, and whether legal examination, certification or consular documents are required should be confirmed in writing by the buyer's customs agent prior to ordering, and the factory should check and issue the time accordingly.

Need a Geomembrane Quotation?

Prepare the thickness, quantity, application and destination port for an accurate quotation.