A multi-product order may combine geomembrane, geotextile, geogrid and related materials with different production cycles and quality controls. Factory coordination should make each line item visible from technical approval through loading.
Convert the order into controlled line items
Each product needs its own approved specification, quantity basis, production route, inspection plan, label and packing requirement.
Coordinate readiness instead of isolated output
Track material availability, production status, testing, third-party review and packing for every line item. Confirm how a delayed item affects the container plan.
Release one reconciled shipment package
Before loading, reconcile physical quantities, labels, reports and packing lists against the final order revision. Record container seal and loading condition.
Project action list
What the procurement or project team should do next
Approve every line item before production
Share the required arrival date and shipment priority
Confirm partial-shipment rules
Review the final quantity and document reconciliation