Standard specifications
Steps to landing
- Get the information indexed first
The following is a list of the projects that will be completed in the next two years:
- The site of the match
The report is based on the anti-counterfeiting materials, the anti-counterfeiting records.
- The amount of verification work
The area, the connection cost, the number of repairs is consistent with the fees.
- Signing coverage permits
The area that is not closed must not be hidden.
Standard specifications
Key parameters and quick judgement tables
| Stage | Check the information | Evidence from the field |
|---|---|---|
| Material coming in | COA, third party reports, container form | The book is a collection of short stories. |
| Transfer of Base Layer | Pressure/Flatness/Water content records | Receiving photos and signatures |
| The floor | The map, the screens and the personnel records | The number of the flag |
| Before the coverage | Detecting and repairing the locks | The defects in the chart, the results of the review |
Standard specifications
Acceptance points and common risks
- SubtitlesPost-compiled data is difficult to prove for real environments and equipment parameters.
- The lack of a mapThe company is also known for its high-quality products.
- The border is unclearThe responsibility for the membrane, fabric, conductive layer and soil construction interface should be clearly transferred.