Containment-System Completion Acceptance: Documents, Tests and Concealed-Work Checklist

The first step is to transfer the batch of materials, the base layer, the layout, the test, the repair and the coverage.

Standard specifications

Steps to landing

  • Get the information indexed first

    The following is a list of the projects that will be completed in the next two years:

  • The site of the match

    The report is based on the anti-counterfeiting materials, the anti-counterfeiting records.

  • The amount of verification work

    The area, the connection cost, the number of repairs is consistent with the fees.

  • Signing coverage permits

    The area that is not closed must not be hidden.

Standard specifications

Key parameters and quick judgement tables

StageCheck the informationEvidence from the field
Material coming inCOA, third party reports, container formThe book is a collection of short stories.
Transfer of Base LayerPressure/Flatness/Water content recordsReceiving photos and signatures
The floorThe map, the screens and the personnel recordsThe number of the flag
Before the coverageDetecting and repairing the locksThe defects in the chart, the results of the review

Standard specifications

Acceptance points and common risks

  • SubtitlesPost-compiled data is difficult to prove for real environments and equipment parameters.
  • The lack of a mapThe company is also known for its high-quality products.
  • The border is unclearThe responsibility for the membrane, fabric, conductive layer and soil construction interface should be clearly transferred.