Geomembrane Puncture and Root Intrusion: Prevention and Repair

The project is designed to clean up, protect geotextile, isolate the roots, cover soil construction and run patrol to form a risk control chain that penetrates the soil.

The project is designed to clean up, protect geotextile, isolate the roots, cover soil construction and run patrol to form a risk control chain that penetrates the soil.

Failure to respond

Geomembrane Puncture and Root Intrusion: Prevention and Repair

Engineering answer

Roots and stony stones should be treated before the laying, and the thickness of the film cannot be relied upon to resist alone. The active root system and building waste should be removed, and the filler material or the soil protection cloth should be replaced when necessary; strong-growing plants should be set at a root position and kept at a safe distance. The extent and substrate of the damage should be first confirmed after detection, and the rounded corners of the material should be used to heat the heat pump, and the edges of the filler should be passed through the area of damage and completed non-destructive testing.

Failure to respond

Acceptance points and common risks

  • The right angleThe tip is more likely to rise and form stress concentrations.
  • Base-layer alien not removedThe same point will be pierced again after repairing.
  • Long-term repair with a rubber bandThe bands can only be temporarily positioned and cannot replace the permanent heat pump.

Failure to respond

Steps to landing

  1. Cleaning the basementThe process of clearing and recording the sharp rodents is completed in stages.
  2. Laying out protective layersThe weight of the grain is determined by the filler diameter and the construction method.
  3. Positioning failureAfter the drainage is cleaned, the visible and potential extension is marked.
  4. Hot-rolledThe first is the use of a rounded corners, grinding, screening and numbering.

Failure to respond

Key parameters and quick judgement tables

The Source of RiskPreventionPre-repair checks
The pointed stone/steel headSeparate layer of silicon + protective clothRemoving foreign objects and pressurized traces
Roots of treesRoot control + root barrier + greeningRoot activity and scope
Construction machineryProviding passage and protection thicknessWheel tracks and tractor directions
Animals/repair toolsEmbarking and tool managementMultiple damage and screening

Need a Geomembrane Quotation?

Prepare the thickness, quantity, application and destination port for an accurate quotation.