Calculation Formulas
Project assessment
Divide the project into floor, slope, bench, anchor and detail zones. Use surveyed geometry and actual slope lengths to calculate net developed area. Add explicitly defined overlaps, anchor allowances, cutting and reserve, then round the panel plan to purchasable rolls. Report net area, purchase area, roll count, estimated seam length and theoretical material mass, with inputs and assumptions retained. When checking panel layouts and purchase quantities, consult Large Containment Projects: A Quick Formula for Geomembrane Quantity.
Calculation Formulas
Procurement and acceptance checklist
| Input | Unit | Calculation use |
|---|---|---|
| Zone dimensions and slope geometry | m | Net developed area |
| Roll dimensions and overlap width | m | Panel layout and seam length |
| Thickness and density | mm, t/m³ | Theoretical sheet mass |
| Allowance and reserve rolls | %, rolls | Purchase quantity and contingency |
Calculation Formulas
Implementation steps
- Identify zonesAssign separate floor, slope, bench and anchor records.
- Measure slope lengthCalculate it from horizontal run and height where necessary.
- Compare layoutsEvaluate roll directions, widths and reusable offcuts.
- Update from site surveyRevise purchase allowance after earthworks and before final ordering.
Calculation Formulas
Risks and controls
- Changed as-built geometryUse the latest accepted survey.
- Disconnected work zonesCheck whether rolls can be shared between stages.
- Unclear mass basisState polymer density and account separately for composite layers and packaging.