Calculating formula
Project judgments and procurement conclusions
The templates should first break down the project into rule areas and then aggregate the net paving area. The fish tank focuses on the calculation of the surrounding slope and solidification residues; the landfill also needs the base of the reservoir, slope, platform, dividing line and throughput nodes. The calculations result in at least the net output area, procurement area, volume, expected length of paving and theoretical weight, to evaluate materials, joints and logistics at the same time.
Calculating formula
Key parameters and quick judgement tables
| Input items | Unit | Exporting uses |
|---|---|---|
| Longitude, width, height/slope ratio of the regions | I'm not sure. | Net area of paving |
| Length of the roll/width of the connector | I'm not sure. | Roughly equal to the length of the pipe |
| thickness and density | mm, t/m3 | Theoretical weight |
| Loss rate and spare volume | %/volume | Purchases and emergency inventory |
Calculating formula
Steps to landing
- Area codeThe table below is B, side S, platform P, and firm A.
- Enter the true slopeThe length of the line is calculated by the difference between the horizontal and the vertical distance.
- Simulated editionThe length of the curve is about 10 cm.
- Repeat on the groundThe remaining purchases were corrected using the results of the pre-works metallurgical terrain.
Calculating formula
Acceptance points and common risks
- Design size as a masonry sizeThe slope of the observation may have changed after the Turku was completed.
- The construction of the subdivision is neglectedThe same total area of rolling stock does not necessarily cross the construction unit adjustment.