Installation Guides
Project guidance
Cold-weather welding requires more than increasing the welder temperature. Frost, condensation, wind cooling and material contraction narrow the workable process window. Make new trial seams at start-up and after significant weather changes or changes of equipment or operator. Set travel speed, temperature and pressure from the measured strength and failure modes of the trial seams. When detailing the installation plan, consult HDPE Geomembrane Heat Welding: Field Procedure, Parameter Control and Seam Testing.
Installation Guides
Installation steps
- Provide a dry, sheltered working areaUnroll and condition the material in advance. Do not use an open flame to heat the liner.
- Complete trial weldingBegin with conservative settings, adjust in small steps and test the resulting seams.
- Test completed sectionsComplete the specified air-channel test before covering dual-track seams. Mark defects, repair them and retest.
Installation Guides
Common risks and controls
- Condensation without visible frostA thin film of water can produce weak seams even when the sheet appears frost-free.
- Excessive heat to maintain speedOverheating can damage the surface or displace molten material, reducing the effective welded width.
Installation Guides
Inspection and acceptance checklist
| Inspection item | Required control | Acceptance record |
|---|---|---|
| Surface before welding | Dry and free of frost, water, mud and sand | Cleaning records and photographs |
| Trial seam | Continuous dual-track seam and acceptable failure mode | Trial-sample identification and test result |
| Environmental conditions | Record air temperature, sheet temperature and wind at the specified frequency | Site welding log |