Calculating formula
Key parameters and quick judgement tables
| V: H-Pongby | Cape of Good Hope | About a percent slope | Purchasing the first batch |
|---|---|---|---|
| The Bible says: | 11.3° | 20% | The photo is comparable, the check is rigid |
| 1:3 | 18.4° | 33.3% | Combining soil-cover and interface testing |
| 1:2 | 26.6° | 50% | Prioritizing the strength and classification of hardness |
| The Bible says: "The whole earth is full of life". | 33.7° | 66.7% | It must be designed to be stable |
The first purchase of the table was not a design conclusion.
Calculating formula
Project judgments and procurement conclusions
In engineering communication, a 1:3 slope can be understood as a slope: horizontal or horizontal: slope, which must be marked V:H. If V:H=1:m is used, slope angleθ=arctan (1/m), slope percentage =100/m. The conversion only solves geometric problems; whether slope film still needs to be cut, ground load, hole pressure and construction period are determined according to the interface.
Calculating formula
Acceptance points and common risks
- The Ponzi scheme is a step backwards.The result is a complete error in the area, angle and stability of the judgement.
- Only select the film by angleWet surfaces, soil cover and hole pressures may be more critical than angles.
- Ignoring the construction phaseThe final stability of the soil does not represent the safety of the laying phase of the bare membrane.
Calculating formula
Steps to landing
- Unified Pump vs. DefinitionAll documents are written as V:H or H:V.
- Calculation of the fractionThe platforms and the slopes are treated separately.
- Column interface combinationsThe film is a sequel to the film, The Secret of the World.
- Complete the direct scanDesign parameters are obtained using materials and terrain samples to be supplied.