Slope-Ratio Conversion and Textured Geomembrane Selection Table

Unified 1: The expression of slope versus slope, percentage slope, angle slope, and the inclusion of interfacing materials and soil conditions in the primary selection.

Calculating formula

Key parameters and quick judgement tables

V: H-PongbyCape of Good HopeAbout a percent slopePurchasing the first batch
The Bible says:11.3°20%The photo is comparable, the check is rigid
1:318.4°33.3%Combining soil-cover and interface testing
1:226.6°50%Prioritizing the strength and classification of hardness
The Bible says: "The whole earth is full of life".33.7°66.7%It must be designed to be stable

The first purchase of the table was not a design conclusion.

Calculating formula

Project judgments and procurement conclusions

In engineering communication, a 1:3 slope can be understood as a slope: horizontal or horizontal: slope, which must be marked V:H. If V:H=1:m is used, slope angleθ=arctan (1/m), slope percentage =100/m. The conversion only solves geometric problems; whether slope film still needs to be cut, ground load, hole pressure and construction period are determined according to the interface.

Calculating formula

Acceptance points and common risks

  • The Ponzi scheme is a step backwards.The result is a complete error in the area, angle and stability of the judgement.
  • Only select the film by angleWet surfaces, soil cover and hole pressures may be more critical than angles.
  • Ignoring the construction phaseThe final stability of the soil does not represent the safety of the laying phase of the bare membrane.
Unified 1: The expression of slope versus slope, percentage slope, angle slope, and the inclusion of interfacing materials and soil conditions in the primary selection.

Calculating formula

Steps to landing

  1. Unified Pump vs. DefinitionAll documents are written as V:H or H:V.
  2. Calculation of the fractionThe platforms and the slopes are treated separately.
  3. Column interface combinationsThe film is a sequel to the film, The Secret of the World.
  4. Complete the direct scanDesign parameters are obtained using materials and terrain samples to be supplied.

Need a Geomembrane Quotation?

Prepare the thickness, quantity, application and destination port for an accurate quotation.