Geogrid Installation for Road Subgrades: Overlap, Tensioning and Anchorage

The following steps are taken to ensure that the pressure is not reduced:

Construction lessons

Project judgments and procurement conclusions

The direction of the main force of the grating must be consistent with the direction of the design force. The horizontal connection and vertical attachment of the single-way grating cannot be interchanged; the two-way grating should also be laid according to the manufacturer's curve and design diagram. The grating needs to be flattened but not pulled into deformation, the fixed nail is only used to maintain position, the structural force depends on the filling constraints and interface bites.

Construction lessons

Steps to landing

  • Sample positioning

    The main purpose of the project is to identify the width, direction and direction of the power lines.

  • The Lappin fixed

    Remove the brush and brush, keeping the mesh hole intact.

  • Filling up

    The height of the landfill is controlled from the area covered.

  • The acceptance of the voltage

    The test phase determines the equipment, frequency and water content.

The following steps are taken to ensure that the pressure is not reduced:

Construction lessons

Acceptance points and common risks

  • The network is not well connectedThe magnetic field cannot be transmitted effectively, and the edges are easily filled and pulled away.
  • The filling particles are too largeThe damage caused by the construction will reduce the effective intensity.
  • No test phaseIt is not possible to confirm the common effects of pressurized equipment on the grating and soft base.

Construction lessons

Key parameters and quick judgement tables

ConnectionsControl requirementsCommon Mistakes
The bottom-upThe first is the "Straight, straight, no hard bounce".Cross the soft trap with a crate
Set upMain strength direction against design directionTurning to the reverse
ConnectedPlug-in or special connectionThe power is provided by fine wire
The buildingFirst covered and rear-end vehiclesThe vehicle was running naked.