Geomembrane Selection for Saline-Alkali Conditions: Chemical Resistance, Resin and Seaming Systems

The keyword for the method is "locking" the liquid components, temperature, immersion cycle and chemical compatibility, avoiding the use of only three words for chemical resistance.

Selection guides

Customer pain points and project conclusions

Selection guides

Procurement and Acceptance Checklists

The checkpointControl requirementsDelivery of evidence
Mediation conditionspH, salt, concentration, temperature are all right.Water and soil samples
Performance of geomembraneResistance to stress fracture, oxidation induction time in line with the targetBatch COA and third party reports
Nodule materialsThe system is a combination of rubber, hose, sealing materials and so on.List of materials and samples

Selection guides

Common risks and addressing them

  • Just look at the moment, pH.The salt concentration, temperature and long-term oxidation changes the durability.
  • Ignoring the stress fractureThe long-term effects of wrinkles, scratches and stiffening areas are more sensitive.
The keyword for the method is "locking" the liquid components, temperature, immersion cycle and chemical compatibility, avoiding the use of only three words for chemical resistance.

Selection guides

Steps to landing

  1. Creating a list of mediumsThe concentration and temperature are listed according to normal cleaning and accident conditions.
  2. Compatibility assessmentHigh-risk projects evaluate changes in quality, size and mechanical performance after immersion using the approved method.
  3. Blocking of demandsThe contract specifies the raw materials, thickness limits, frequency of testing and sampling.

Need a Geomembrane Quotation?

Prepare the thickness, quantity, application and destination port for an accurate quotation.